Scheduled Reports
Scheduled Reports automate the generation of Data Reports.
Generated files are stored in the Report Files overview and can be downloaded in the same way as manually created reports.
Creating a Scheduled Report
- Navigate to Reports → Scheduled Reports.
- Click the + button.
- Configure the report.
- Click Save.
Report Configuration
The report configuration for Scheduled Reports is identical to the configuration used for manually created Data Reports.
Available Report Periods
- Full Previous Calendar Day
- Full Previous Calendar Days
- Full Previous Calendar Week (Mon – Sun)
- Full Previous Calendar Month
Schedule Configuration
Active
Determines whether the configuration is currently active.
Execution Delay
The Report is generated from 00:00 UTC. The Execution Delay postpones report generation by a configurable number of minutes after the scheduled execution time (up to one week), ensuring that as much data as possible is processed before the Report is generated.
Supported range:
- 0 minutes to
- 10,080 minutes (7 days)
Managing Scheduled Reports
The Scheduled Reports overview provides information such as:
- Status
- Data Area
- Report Period
- Execution Delay
- Last Successful Execution
- Creation Date
- Last Modified Date
Editing Scheduled Reports
Existing configurations can be modified at any time.
Generated Report Files
Every successful execution of a Scheduled Report creates a new report file.
These files are available under:
Reports → Report Files