Scheduled Reports

Scheduled Reports automate the generation of Data Reports.

Generated files are stored in the Report Files overview and can be downloaded in the same way as manually created reports.

Creating a Scheduled Report

  1. Navigate to Reports → Scheduled Reports.
  2. Click the + button.
  3. Configure the report.
  4. Click Save.

Report Configuration

The report configuration for Scheduled Reports is identical to the configuration used for manually created Data Reports.


Available Report Periods

  • Full Previous Calendar Day
  • Full Previous Calendar Days
  • Full Previous Calendar Week (Mon – Sun)
  • Full Previous Calendar Month

Schedule Configuration

Active

Determines whether the configuration is currently active.

Execution Delay

The Report is generated from 00:00 UTC. The Execution Delay postpones report generation by a configurable number of minutes after the scheduled execution time (up to one week), ensuring that as much data as possible is processed before the Report is generated.

Supported range:

  • 0 minutes to
  • 10,080 minutes (7 days)

Managing Scheduled Reports

The Scheduled Reports overview provides information such as:

  • Status
  • Data Area
  • Report Period
  • Execution Delay
  • Last Successful Execution
  • Creation Date
  • Last Modified Date

Editing Scheduled Reports

Existing configurations can be modified at any time.


Generated Report Files

Every successful execution of a Scheduled Report creates a new report file.

These files are available under:

Reports → Report Files